O & M Bisalpur, Jaipur Location: Jaipur Client: PHED Sector: Operation And Maintenance Starting Date: 21.02.2022 Project Brief: Bisalpur Jaipur Water Supply Project (BJWSP) has been designed to deliver water from the existing Bisalpur Dam to Balawala on the south edge of Jaipur city to reduce the city’s dependence on existing groundwater resources and includes complimentary provision for supplying water to other areas. In this project, GA Infra is liable to operate, maintain and repair the complete Bisalpur, Jaipur water supply project (Transfer system) for the Upstream Boundary, Downstream Boundary, and for the SCADA system also....

RSRDC Extension of Medical College Barmer Location: Barmer Client: RSRDC Sector: Building Starting Date: 24.12.2021 Project Brief: Under this project GA Infra is executing all civil works and electrical works of Medical College to upgrade the admission capacity of Medical College from 100 to 130....

JJM Jawai Pali Location: Pali District Client: PHED Rajasthan Sector: Jal Jeevan Mission Starting Date: 5.12.2021 Project Brief: Under JJM, The Project is designed to provide safe and potable drinking water to over 224 villages and their 123 other habitations of tehsil Bali, Desuri and Rani under Jawai Cluster IV. This project is a part of a large scheme of water supply projects planned by State Government to provide piped drinking water to every household. Major components of this work includes: Construction testing and commissioning of 5Nos. CWR, with total capacity of 350kL. Designing providing laying jointing testing and commissioning of 1336Km pipeline. Construction of 7 Nos. Pumping stations , 18Nos. RCC Intz tank type ESR, 19Nos. RCC Flat slab OHSR and 11 Nos. GLSR at different locations. Commissioning of 36231 Nos. house service connections with service level of 55LPCD. ...

JJM Anoopgarh Location: Sriganganagar District Client: PHED Rajasthan Sector: Jal Jeevan Mission Starting Date: 20.02.2022 Project Brief: Under JJM guideline, our company is undertaking survey, designing and preparation of DPRs of various components of canal (surface water) based rural water supply scheme. The scheme includes construction and commissioning of tube wells and pipelines to provide FHTCs in the division of Anoopgarh, District Sriganganagar....

STP Moradabad Location: Moradabad Town Client: NMCG / UPJN Uttar Pradesh. Sector: Sewage Treatment Plant Starting Date: 2020 Project Brief: The government of India has approved the Namami Gange program as an integrated approach for effective abatement of pollution in the river Ganga. As part of this and to ensure that no untreated domestic sewage flows into the river Ganga, various interventions are planned such as interception & diversion works and development & operation of sewage treatment plants (STPs). Considering various development models in practice for the construction, operation, and maintenance of STPs, the government of India has approved the Hybrid Annuity-based Public-Private Partnership (PPP) model as one of the options for the development & operation of STPs. Under this model, a private investor/developer will design, build, finance, operate, and transfer the asset (STP) to the Project Executing Agency / UP Jal Nigam at the end of the concession period (say 15 years). 40% of the capital cost will be paid to the developer during the construction of the STP. Balance 60% along with Operation & Maintenance (O&M) cost will be paid over the concession period on a quarterly basis on the achievement of key performance indicators as per the contract. Interest shall be payable on the reducing balance of 60% of the completion cost for the relevant facility, at the rate of the SBI MCLR plus 3% per annum. Such interest shall be due and payable quarterly along with each installment of the capex annuity. The entire cost of development and operation of the STPs will be 100% funded by the government of India as a central sector scheme. There is a proposed 25 MLD STP. After treating sewage effluent water will discharge into Ram Ganga River (Tributary of Ganges)....

STP Budhana-Muzaffarnagar Location: Budhana Town & Muzaffarnagar Town Client: NMCG / UPJN Uttar Pradesh. Sector: Sewage Treatment Plant Starting Date: 2020 Project Brief: The government of India has approved the Namami Gange program as an integrated approach for effective abatement of pollution in the river Ganga. As part of this and to ensure that no untreated domestic sewage flows into the river Ganga, various interventions are planned such as Interception & Diversion works and the development & operation of Sewage Treatment Plants (STPs). Considering various development models in practice for the construction, operation, and maintenance of Sewage Treatment Plants, the government of India has approved the Hybrid Annuity based Public-Private Partnership (PPP) model as one of the options for the development & operation of STPs. Under this model, a private investor/developer will design, build, finance, operate, and transfer the asset (STP) to the Project Executing Agency / UP Jal Nigam at the end of the Concession Period (say 15 years). 40% of the Capital cost will be paid to the developer during the construction of the STP. Balance 60% along with Operation & Maintenance (O&M) cost will be paid over the Concession Period on a quarterly basis according to the achievement of key performance indicators mentioned in the contract. Interest shall be payable on the reducing balance of 60% of the completion cost for the relevant Facility, at the rate of the SBI MCLR plus 3% per annum. Such interest shall be due and payable quarterly along with each installment of the Capex Annuity. The entire cost of development and operation of the STPs will be 100% funded by the government of India as a central sector scheme. Pollution abatement of river Ganga has been identified as a major step in fulfilling the mandate of the National Mission for Clean Ganga under the Namami Gange Program. Budhana is located on the banks of the river Hindon. At present, there is no sewerage facility available in Budhana and Muzzafarnagar. Therefore, all the sewage generated in the city is finding its way into open drains. There are three drains in Budhana town and Muzzafarnagar town carrying wastewater and they pollute the river directly. There are three proposed SBR based STPs i.e. 32 MLD, 22.5 MLD & 10 MLD....

Drinking Water Supply (Solar) Location: Karauli, Sawaimadhopur, Bharatpur, Dausa, Jhunjhunu, Sikar, Kota, Bundi, Baran, Jhalawar, Jaipur, Udaipur Client: PHED Rajasthan. Sector: Solar Based Water Supply Projects Starting Date: 2020 Project Brief: GA Infra design, provide, install solar-based pumping units with PSP units. GA Infra has installed more than 300 units of 1 HP to 20 HP capacity of solar-based pumping units in various parts of Rajasthan. GA Infra has commissioned the first-ever solar-based pump house on the India Pakistan border at Jaisalmer. Through these plants, the people of Rajasthan are getting water at a place where even electricity has not reached. In this project, GA Infra has the order to install more than 850 plants in various geographical locations across Rajasthan....

RWSS Mahauri UP Location: Mirzapur, UP Client: SWSM UP. Sector: Rural Water Supply Scheme Starting Date: 2020 Project Brief: This scheme is under the Jal Jeevan Mission. The objective of the project is to provide drinking water through the pipe system to every household under the project area. Through this project, a total of 129 villages will be benefited. Under this water supply scheme, both surface-based water supply (31 villages) & tube-well based water supply (98 villages) is used. There is a scope to construct the 8 MLD WTP and associated ancillary activities....

O&M Chambal Bharatpur Location: Dholpur - Bharatpur Client: PHED Rajasthan. Sector: O & M Project Starting Date: 2020 Project Brief: Operate and maintain the entire Chambal – Dholpur – Bharatpur Water Supply Transmission system consisting of the intake pump house, raw water pumping station Sagarpada, raw water pumping station Mallah, the raw water reservoirs at Sagarpada of 25.60 ML and Mallah of 220 ML, Water Treatment plant of 112 MLD, the Clear Water Reservoir of 10 ML, the Raw Water Mains with cathodic and surge protection system, the 33 kV switchyards at Intake, Sagarpada and Mallah Head Works, Raw Water Supply system to Dholpur city, water supply system to KNP and all ancillary buildings, campus area, roads and ancillary civil structures, service roads, along with the pipeline for the 5 Years....

O & M Barmer Location: Barmer Client: PHED Rajasthan. Sector: O & M Project Starting Date: 2020 Project Brief: This project will fulfill the requirement of 580 villages of Barmer & Jaisalmer. The project has the scope of work to complete 5 years of operation & maintenance of Water Supply, Raw Water Pump Houses, Raw Water Reservoirs, etc....