UWSS Chittorgarh Location: Chittorgarh City Client: PHED Rajasthan. Sector: Urban Water Supply Scheme Starting Date: 2018 Project Brief: There is a wide gap in the infrastructure available and that required to meet the present demand in the towns. The necessity of this project is due to lower service levels, low pressures, small duration, uncovered area, and poor asset conditions. To solve the drinking water problems in Chittorgarh, it is proposed to extend & reinforce the existing transfer system to various service reservoirs, construct new CWRs & OHSRs, laying of new transfer mains, etc. The existing distribution network will be strengthened and a new distribution system is proposed to be laid in uncovered areas....

UWSS Bikaner Location: Bikaner City Client: PHED Rajasthan. Sector: Urban Water Supply Scheme Starting Date: 2018 Project Brief: The design period of the water supply scheme is the year 2045. Over 750000 people of Bikaner City will be benefited from this project. The primary objective of the proposed project is to provide safe & potable drinking water to the Bikaner City of Bikaner District. Another important objective is to create a sustainable infrastructure for drinking water supply in the project area, improve health, reduction in instances of waterborne diseases in the targeted population, and the reduction in hardships especially for the women & underprovided section of society....

Arsenic/Fluoride removal UP Location: Prayagraj, Mirzapur, Chitrakoot, Jhansi, Devipatan, Faizabad UP Client: UP Jal Nigam. Sector: Solar power based Arsenic / Fluoride Removal Projects Starting Date: 2020 Project Brief: The complete work consists of a bore-well (source of raw water), SPV and solar pump, 3 stage overhead structure, raw/ treated water, HDPE storage tank of 5000-liter capacity, Arsenic/ Fluoride removal units, and other related works for proper distribution of treated water....

Solar DFU Projects Location: Karauli, Sawaimadhopur, Bharatpur, Jodhpur, Pali, Sirohi, Jalore Uadipur Client: PHED Rajasthan. Sector: Solar Based Water Supply Starting Date: 2020 Project Brief: GA Infra manufacture and supply De-Fluoridation units for the fluoride affected areas. GA Infra De-Fluoridation unit is available on media-based (Bio F/AA) and also with Automatic Fluoride Removal Unit (ARFU) (approved by MNIT) based on electrocoagulation. GA Infra De-Fluoridation unit has the capacity to reduce fluoride to 0.5 PPM even from 15 PPM fluoride content in raw water. They have rapidly installed more than 2500 units of 1000 LPH capacity to date and we are running these units successfully in various parts of the country. These De-Fluoridation units can work with or without conventional electricity and be clubbed with solar energy-based pumps to provide disruption-free, end-to-end solutions to the consumers. In this project, GA Infra has orders to execute more than 2500 units of 1000 LPH capacity....

RWSS Sri Ganganagar Location: Ganganagar Rural Client: PHED Rajasthan. Sector: Rural Water Supply Scheme Starting Date: 2018 Project Brief: There are 27  villages that are covered in this water supply scheme. Every scheme covered under this package is based on canal water available through Gang canal and Bhakhra canal. The works included in this package are for the improvement of water supply under existing canal water-based Rural Water Supply schemes under the division Sri Ganganagar....

RWSS Deeg Nagar Location: Deeg Rural & Nagar Rural Client: PHED Rajasthan. Sector: Rural Water Supply Project Starting Date: 2018 Project Brief: A total of 283 villages of Deeg & Nagar tehsils is proposed to be covered under this project. Any new revenue villages created after the 2001 census, from over & above of 283 villages shall also be treated separately and covered under this work, with the construction of the separate Village Transfer Chamber (VTC). All other habitations of the above villages shall also be covered. In this project, 8  Clear Water Reservoir with a total capacity of 3700 KL, 7 pumping stations, construction of 62 Elevated Service Reservoirs (ESR), and 1700 km pipeline has been laid....

ESCO Kailana Location: Kailana Jodhpur Commissioned Under: PHED Rajasthan. Sector: ESCO Based O&M Water Supply Project Commissioning Year: 2013 Project Brief: This project had work of supplying, installing, operating & maintaining 1360 KW VT energy-efficient pumping machinery including mechanical and electrical installation works at the raw water pumping station at Kailana, Jodhpur under PPP mode.  The capacity of the scheme is 145 MLD and 59,51,833 kWh energy is saved annually after the replacement of electro-mechanical equipment. More than 10 lakh people of Jodhpur have benefited from this project....

Community Based Reverse Osmosis Plant Location: Sirohi, Jodhpur, Pali, Jalore, Jaisalmer, Barmer, Ajmer, Nagaur. Client: PHED Rajasthan. Sector: RO Based Community Water Supply Project Commissioned Year: 2013-2019 Project Brief: At GA Infra, we manufacture and supply community-based RO plants (500 to 3000 LPH) for raw water TDS up to 25000 PPM. We have supplied and installed more than 1100 plants till now. All our plants are equipped with a remote monitoring system and an ATM-based water dispensing system. All the plants are in operating condition and more than 5 lakh population in various water quality affected villages of Western Rajasthan are benefiting from these plants. ...

Reorganization of UWSS Tonk Location: Tonk City Client: PHED Rajasthan Sector: Urban Water Supply Scheme Commissioning Year: 2019 Project Brief: The UWSS Tonk needed an upgrade due to improper distribution and insufficient storage capacity of water.  Earlier the pressure of water was very low and many colonies were not getting drinking water with good pressure. For proper water storage, GA Infra had made a CWR of 5000 KL capacity, 80 KM of the pipeline, and OHSR. The population of more than 2 lakh people of Tonk city is now getting the benefit of this project....

Urban Water Supply Scheme of Bikaner Location: Bikaner City Client: PHED Rajasthan. Sector: Urban Water Supply Scheme Commissioning Year: 2018 Project Brief: Earlier the pressure of water in the Bikaner city was very low and many colonies were not getting pure drinking water. After completion of this project, the people of Bikaner City are getting pure water with good pressure. GA Infra had laid a 1400 mm diameter transmission main pipeline of 9.7 km to full fill the requirement of the people. For proper water supply and storage, GA Infra had made CWRs of 1000 to 1500 KL in the city. More than 7.5 lakh people of Bikaner City are now getting the benefit from this project....